Yorkshire Schools Project
(Seven new-build schools in the Yorkshire area £525,000)
Main Contractor Laing O’ Rourke
Architect: Atkins
Structural Engineer: Atkins
- Secondary steelwork
- Roof plant screens
- Stainless steel staircase and slab edge balustrades
- Staircases
- External metalwork and handrails
The National Biologics Centre, The Centre for Process Innovation, Darlington
(New build Pharmaceutical research centre. £110,000)
Main Contractor: Interserve Construction
Architect: Archial Norr
Structural Engineer: Billinghurst George and Partners
- Stainless steel feature staircase with structural glass balustrades and hardwood timber treads
- Stainless steel balustrades to staircases
- Structural glass balustrades to cantilevered balconies
Little Kelham Urban Village, Sheffield
(Residential development £125,000)
Main Contractor: Bay Construct
Architect: Cal Architects
Structural Engineer: Cundalls
- 32T structural steelwork podium car park structure with balustrades and staircases
- Cantilevered balconies and Juliet balconies
- Miscellaneous support steelwork for timber frame construction
Crispin House, Leeds
(Conversion of existing mill building into apartments £268,000)
Main Contractor: GB Building Solutions
Architect: Carey Jones
Structural Engineer: Fairhurst
- Adaption and erection of 35T structural steel inside an existing basement to form new split level parking including composite floor decking
- Design and installation of temporary propping steelwork to allow formation of new car park entrance through existing ground floor wall including permanent support steelwork
- Additional floor support steelwork to 8 levels of existing timber flooring
- Structural survey and remedial works to exiting steelwork part erected during an aborted refurbishment scheme
- Copper cladding to form lobby feature walls to 8 floors
- Mild steel and glass balustrades to Metropolis atrium area
- Glazed balustrades to 48nr split level apartments
- External segregation balustrades and gates to penthouse patio areas
- Polished stainless steel fascias to commercial units
- 14 sets of 8 story mild steel stair balustrades
- Stainless steel wall-mounted handrails to 117nr apartments
- 46nr sunken deck ships ladders and associated balustrades
- 12T structural steelwork to form extension to penthouse apartments
- Install laser cut polished stainless steel signage throughout the building
Sniperley Fire Station
(New build fire station for Durham and Darlington Fire and Rescue £55,000)
Main Contractor: Bowmer and Kirkland
Architect: Napper Architects
Structural Engineer: Fairhurst
- Two mild steel radiused feature staircases with mild steel, glass and timber balustrades
- Hooped access ladders
- Bespoke smoke-tight window shutters
- Bespoke Training House removable partitions
- Fire pole
- Pitched training roof and balustrades
Crook Fire Station
(New build fire station for Durham and Darlington Fire and Rescue £95,000)
Main Contractor: Interserve Construction
Architect: Napper Architects
Structural Engineer: Billinghurst George and Partners
- Structural steel floor decks to 5 story training tower
- Two mild steel radiused feature staircases with mild steel, glass and timber balustrades
- Two sets of internal staircase and balustrades
- Aluminium parapet capping
- Training mezzanine structure including guardrails, stair, training tube and ladder
- Bespoke smoke-tight window shutters
- Bespoke Training House removable partitions
- Fire pole
- Pitched training roof and balustrades
Bowburn Fire Training Centre
(New build fire training centre £165,000)
Main Contractor: ISG PLC
Architect: Napper Architects
Structural Engineer: Portland Consulting
- 14m high stand-alone fire training tower
- 35T structural steel working at height training structure containing
- ‘Rat run’ maze cages
- Internal mild steel staircases
- Roof access platforms and balustrades
- Bespoke smoke-tight window shutters
- Sundry structural steelwork
Richmond Hill Primary School
(New build Primary School £82,000)
Main Contractor: Interserve Construction
Architect: Space Group
Structural Engineer: Billinghurst George and Partners
- External radiused stair and enclosure
- Mild steel, glass and timber balustrades to two internal staircases
- Mild steel, glass and timber balustrades to internal light wells
- External balustrades, mesh enclosures and play equipment
Kings College, London
(New build student accommodation £230,000)
Main Contractor: GB Building Solutions
Architect: GWP Architecture
Structural Engineer: Curtins Consulting
- 35T structural steelwork basement grillage
- Supply 82nr mild steel stair flights
St Marks Square Student Residence, Leeds
(New build student accommodation £480,000)
Main Contractor: GB Building Solutions
Architect: GWP Architecture
Structural Engineer: WSP Group
- Supply and install 78nr mild steel stair flights with mild steel and glass balustrades
- 18T Basement structural steelwork
- Eight sets of 6 story lift shaft support frames
- Close to 1 mile of boundary fencing, vehicle and pedestrian security gates
- Energy Centre structural steelwork and plant guarding
Proctor and Gamble Factory
(New-build factory for Proctor and Gamble £106,000)
Main Contractor Bowmer and Kirkland
Architect: Redbox
Structural Engineer: Cundalls
- Secondary steelwork
- Feature staircases and stainless steel balustrades
- Roof plant decks, flooring, guarding and access staircases
- External access ladders and platforms
The Sustainable Enterprise Centre, Bradford
(New build university campus £95,000)
Main Contractor: GB Building Solutions
Architect: Farrell and Clark
Structural Engineer: WSP Group
- Five-flight mild steel helical stair with hardwood treads and mild steel balustrade with glass infills
- Roof top stainless steel balustrades
- Atrium structural glass balustrades
- Atrium balconies and tensioned stainless steel balustrades
The Green, Sustainable Student Village, Bradford
(New build student accommodation £140,000)
Main Contractor: GB Building Solutions
Architect: GWP Architecture
Structural Engineer: WSP Group
- 15T Structural steel frame building including mild steel staircase and balustrades
- Radiused architectural viewing gallery
- External ramp and stair balustrades
- Service riser flooring
- Miscellaneous external metalwork including cycle store security gates, etc
BMW/Mini Garage
(New build car showroom with workshop facilities £27,000)
Main Contractor Caddick Construction
Architect: Unwin Jones
Structural Engineer: KSA Consulting Engineers
- Secondary steelwork
- External metalwork and balustrades
- Alterations to structural steelwork
Printworks, Leeds
(New build/refurbishment university campus £142,000)
Main Contractor: GB Building Solutions
Architect: Seven Architecture
Structural Engineer: Curtins Consulting
- Structural glass atrium balustrades
- Five sets of stainless steel stair balustrades
- Insertion of 15T of additional steelwork into existing roof structure to support new roof openings
- Solar panel support steelwork
Larchfield Enterprise and Innovation Centre, Huddersfield
(New build university campus £265,000)
Main Contractor: GB Building Solutions
Architect: DLA Architecture
Structural Engineer: Tim Stower and Partners
- External stainless steel balustrades with tensioned wire infills
- External stainless steel stair balustrades and guarding
- Structural glass balustrades to two staircases
- Mild steel feature staircase with full height structural glass balustrades
- Entrance canopy architectural support steelwork
- 60m long cantilevered structural riverside walkway and stainless steel balustrades
- Miscellaneous structural steelwork adaptions
Harrogate District Hospital
(Refurbishment of hospital wing £35,000)
Main Contractor: Interserve Construction
Architect: NHS Estates
Structural Engineer: Billinghurst George and Partners
- Structural steel plant decks, access staircases and associated works, carried out over weekend posessions in a live hospital environment
GB Building Solutions – Wakefield College
(New college campus £45,000)
Main Contractor: GB Building Solutions
Architect: DLA Architecture
Structural Engineer: Tim Stower and Partners
- Internal stainless steel balustrades to staircases and void edges
- Internal mild steel stair and balustrades
- External communal area balustrades
- Service riser flooring infills
- Sliding screen support steelwork
- External glazed canopy
Campus House, Bradford
(Refurbishment of 1912 textile mill into student campus £42,000)
Main Contractor: GB Building Solutions
Architect: GWP Architecture
Structural Engineer: Tim Stower and Partners
- 12 flights of mild steel stairs and powdercoated balustrades inserted into the existing building
- Miscellaneous remedial structural support steelwork
Wilmington Waste Transfer Station
(Adaptions and refurbishment of existing waste handling station £130,000)
Main Contractor Bay Construct
Architect: Client
Structural Engineer: Cundalls
- Adaptions to existing structural steel frame to form seven new openings
- Installation of 40T steel plates to new RC push walls
- Installation of 25T steel ‘spill’ plates to push walls
- External metalwork and vehicle impact guarding
Chesterfield Football Club
(New build Football Stadium £220,000)
Main Contractor: GB Building Solutions
Architect: WMA Architects
Structural Engineer: Opus International
- Radiused entrance canopy
- Helical mild steel feature stair with glass/timber balustrades
- Spiral staircase
- 1.8 miles of galvanised pitch side and terraces safety guardrails
- Gantry steelwork to form TV viewing platform
- Six sets of internal stair balustrades
- Exterior doors and security gates
- Miscellaneous structural steelwork
Portobello House
(New-build student development £32,000)
Main Contractor Robertson Construction
Architect: Corstorphine and Wright
Structural Engineer: Roscoe
- Supply-only 30nr pre-fabricated staircase units
University of York – Centre for Immunology and Infection
(New build University campus £62,000)
Main Contractor: GB Building Solutions
Architect: William Saunders Architects
Structural Engineer: Client
- Nylon coated internal balustrades to two internal staircases
- Arch structural support steelwork
- Service riser flooring
- Sliding partition support steelwork
- Link bridge support steelwork